Today was another day of construction at the house and now they're all done with wiring. All that's left to finish up is the insulation, drywall, installing fixtures and painting.
Here are some new switches and outlets:
At the top of the picture is the heater/fan for the bathroom and two lights just beyond that:
Lindsay's closet with new lights and switches:
New can lights in the basement:
Wednesday, May 2, 2012
Construction Day 6 - Wiring
Labels:
basement,
construction,
master bath,
master bedroom,
master suite,
wiring
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment