Today was another productive day at the house. We got two new doors installed, one of them at the bottom of the stairs. This looks about 100 times nicer than the old door that was there and it helps make the rest of the place look more finished:
Here's the door on the new part of the beer closet:
This is a view of inside the beer closet. They took out the inside wall and just left the wall that covered the stairs.
They also installed all the trim in the basement:
They even put some new trim on the stairs to help transition from drywall to the existing paneling.
Next week the painting begins in the basement and the floor tile will go into the bathroom. By the end of next week, we should have windows installed upstairs as well.
No comments:
Post a Comment