Construction Day 25 - Trim and Doors Painted in the Basement, Doors Installed Upstairs

The workers got quite a bit more done today both downstairs and in the master bedroom.

The trim and doors in the basement have been painted (the first coat has gone on):

Here's a closeup of some of the trim paint:


The door to the closet at the top of the stairs has been reinstalled:

The closet doors are now installed and look good:

One of the original closet doors from upstairs was cut down and reinstalled in our small storage space behind the bathroom:

The hardware has been installed in the vanity:

Here's the kneewall access in the closet - it will be painted white like the trim: