We just finished up week 4 of construction and the whole house is drywalled, mudded and ready for paint.
Here's the second of two new glass-block windows installed in the basement:
The master bedroom/bathroom and basement ceiling is textured and all finished.
Here's a shot looking from the main part of the bedroom into the bathroom:
The tile got delivered today and should be installed in the shower tomorrow:
Another shot of the bedroom from the bathroom door:
No comments:
Post a Comment